SAP ABAP Data Element PK_PLGEN (Planned ord. - create for amount of reversal - GR - quantity)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
MD05 (Package) Development class KANBAN
⤷
⤷
⤷
Basic Data
| Data Element | PK_PLGEN |
| Short Description | Planned ord. - create for amount of reversal - GR - quantity |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | PK_PLGEN | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Plnd order |
| Medium | 15 | Planned orders |
| Long | 20 | Planned orders |
| Heading | 6 | Crt.PO |
Documentation
Definition
If you have chosen a process with run schedule quantities or production orders and planning with MRP, then on creating a run schedule quantity or a production order, the planned orders created by MRP are reduced accordingly. If the run schedule quantity or the production order is deleted by a cancellation, then here you can control whether and how the reduced planned orders are to be created again. You have the following options:
- The system creates planned orders amounting to the cancelled order for the current day.
- The system creates planned orders by an asynchronous material requirements planning (single-item planning, single-level), which is carried out automatically after the cancellation.
- The system does not create any planned orders.
History
| Last changed by/on | SAP | 20041209 |
| SAP Release Created in |