SAP ABAP Data Element PEKSTAR (Cost Element)
Hierarchy
SAP_HRGXX (Software Component) Sub component SAP_HRGXX of SAP_HR
   PE (Application Component) Training and Event Management
     PP09 (Package) Training and Event Management
Basic Data
Data Element PEKSTAR
Short Description Cost Element  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type KSTAR    
Data Type CHAR   Character String 
Length 10    
Decimal Places 0    
Output Length 10    
Value Table CSKA    
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID KAT  
Default Component name COST_ELEM   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Cost Elem. 
Medium 15 Cost Element 
Long 20 Cost Element 
Heading 10 Cost Elem. 
Documentation

Definition

Schlüssel, welcher a cost element eindeutig identifiziert.

Cost elements are the cost-relevant items of a chart of accounts. You use cost elements to enter the different costs that occur in an accounting system.

Dependencies

Cost elements are the prerequisite for comprehensive reporting and detailed planning.

Supplementary Documentation - PEKSTAR 0001

Use

In primary cost planning/revenue planning, you can plan a cost element/ revenue element or a group of cost elements/revenue elements.

You plan cost element groups/revenue elements groups when you want quick access to all cost elements and revenue elements in your cost center for planning purposes.

By planning cost element groups/revenue groups, you have the advantage of not having to fill the in the intial screen for each cost element/ revenue element.

Procedure

You can either use a single value, an interval or a group.

Revenue element groups are maintained as cost elements (cost element type 11) in the master data. They are also treated as cost elements.

Supplementary Documentation - PEKSTAR 0002

Use

In this field, you specify the lower limit of the cost element range to which the following definition of revaluation percentages applies:

  • The cost element lower limit is derived from the entries in the cost element selection criteria. If you entered a cost element range here, the lower limit matches this field. If you entered a cost element group, the lower interval limit is derived from the value in the cost element group (area) field.
  • If the cost element range is too broad, that is you want to revalue a smaller range of cost elements, you must change the cost element group using the relevant maintenance transactions or select a more suitable cost element group.

Examples

You are using a cost element group containing the following cost elements:

From        To

400000    410000

419999    420000

429999    430000

Here, the values 400000, 410000,420000, 430000 are lower limits limits. You can switch between the cost element ranges and their revaluation percentages using the relevant function key.

Dependencies

Supplementary Documentation - PEKSTAR 0003

Use

In this field, you specify the upper limit of the cost element range to which the following definition of revaluation percentages applies:

  • The cost element upper limit is derived from the entries in the cost element selection criteria. If you entered a cost element range here, the upper limit matches this field. If you entered a cost element group, the upper limit is derived from the value in the cost element group (area) field.
  • If the cost element range is too broad, that is you want to revalue a smaller range of cost elements, you must change the cost element group using the relevant maintenance transactions or select a more suitable cost element group.

Examples

You are using a cost element group containing the following cost elements:

From        To

400000

410000    419999

420000    429999

430000

Here, the values 400000, 410000,420000, 430000 are upper limits. You can switch between the cost element ranges and their revaluation percentages using the relevant function key.

Supplementary Documentation - PEKSTAR 0004



Use

Procedure

You must enter a category 03 cost element (cost element for imputed surcharges) here to be able to calculate the imputed costs.

Examples

Dependencies

Supplementary Documentation - PEKSTAR 0005

Use

Procedure

You must enter a cost element of type 41 here for the overhead rates.

Examples

Dependencies

Supplementary Documentation - PEKSTAR 0006

The SAP System takes over all of the attributes of the template cost element when creating a new cost element.

Exception:

If you specify a secondary cost element template when creating a primary cost element or vice versa, the cost element type is not taken over.

Supplementary Documentation - PEKSTAR 0007



Use

When you maintain the credit objects for target=actual imputed costs, the system lists the existing target=actual cost elements for the relevant controlling area.

Procedure

Providing these cost elements also are planned, the offsetting entry must be known when processing actual imputed costs for the postings to be made.

The cost center to be credited or the order to be credited is specified in the detail screen you reach by selectin the cost element to be maintained.

Supplementary Documentation - PEKSTAR 0008



Use

When you maintain the credit objects for the target=actual imputed cost calculation, you specify the cost center or order to be credited with the valid-to date in the detail screen of the selected target=actual cost element.

Supplementary Documentation - PEKSTAR 0009



Use

A base object cost estimate consists of one or more costing items (such as materials, internal activities, overhead). A base object cost estimate itself can appear as a costing item in another cost estimate.

The system assigns each costing item to a cost element.

  • If you enter a cost element in the base object master, the base object item is automatically assigned to this item.
  • If you do not enter a cost element, you have to assign the base object item to a cost element manually.

Procedure

Examples

Dependencies

Supplementary Documentation - PEKSTAR 0020



Use

The results of the WIP calculation and the results analysis are updated under results analysis cost elements. You can define posting rules which link these results analysis cost elements (e.g. work in progress for material costs) directly with G/L accounts.

Procedure

When you define posting rules per cost element, you will need to define a posting rule for each relevant results analysis cost element.

Examples

You have created the following line IDs for the WIP calculation:

Line ID    Meaning

DC    Direct costs

PC    Production costs

OH    Overhead (which cannot be capitalized)

Under "Define update", you specified the cost element under which work in progress and, if necessary, provisions for missing costs will be updated during the WIP calculation.

WPP    Work in progress    Provision

DC    672111    673111

PC    672131    673131

OH    672121    673121

In this case, you will need to define five posting rules:

  • For work in progress, connect cost elements 672111 and 672131 to the corresponding G/L accounts
  • For provisions, connect cost elements 673111, 673131 and 673121 to the corresponding G/L accounts.

Dependencies

If you want to display the entire work in progress in Profit Center Accounting, you will also need to define a posting rule for cost element 672121 (costs which cannot be capitalized).

Supplementary Documentation - PEKSTAR 0100



Use

Allocatable activity types are allocated through the allocation cost element entered here. You must create this cost element in the cost element master data as a secondary cost element of the category "internal activity allocation".

Notes

Field changes

This field can be changed at fiscal year level (e.g. for a new fiscal year).

Time dependency

This field is always time-dependent.

Supplementary Documentation - PEKSTAR 0140

Procedure

Enter a cost element to be able to plan and store costs for the transaction.

Supplementary Documentation - PEKSTAR 0200

Use

If you perform transfer posting for revenues, enter the relevant account assignment for the revenues here.

Supplementary Documentation - PEKSTAR 1021

Use

Procedure

You can enter a single cost element here that will be used for data collection. If you require data from several cost elements, enter nothing here. Instead, enter a cost element group or press F5 to display more selection criteria and select the cost elements you require.

Examples

Supplementary Documentation - PEKSTAR 1500

Use

When you maintain the credit line for a credit, you must specify the accrual cost element under which an overhead that is to be determined will be posted. The cost element must be an overhead cost element.

Procedure

Examples

Dependencies

Supplementary Documentation - PEKSTAR 1600



Use

When you maintain the credit records for a target=actual credit, the target=actual cost elements created in the current controlling area are displayed.

Procedure

Examples

Dependencies

History
Last changed by/on SAP  20040116 
SAP Release Created in 500