SAP ABAP Data Element PEB (Indicator: billing line item relates to period-end billing)
Hierarchy
IS-UT (Software Component) SAP Utilities/Telecommunication
   IS-U-BI (Application Component) Contract Billing
     EE20 (Package) IS-U: Billing
Basic Data
Data Element PEB
Short Description Indicator: billing line item relates to period-end billing  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type KENNZX    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 PE billing 
Medium 15 PE billing 
Long 20 Period-end billing 
Heading
Documentation

Definition

If this indicator is set, it means that the billing line item was generated in period-end billing.

Supplementary Documentation - PEBEGUZ 0001

Use

You can enter the start time of a substitution record here.

If you define a substitution with individual daily work schedule (also known as a time substitution) overrides the employee's work schedule.

The exception is if you also specify a position in combination with a time. If you do so, you can store substitutions on a hourly basis, which then do not override the employee's work schedule.

Supplementary Documentation - PEBEGUZ 0002

Use

In this field you enter the start time of the availability record.

Depending on the availability type concerned, the times you enter are interpreted differently. As a rule, the times specified apply to every day of the validity period. In the special case of on-call duty, the times specified do not refer to a time range, but specify the start and end times of the complete on-call duty.

Procedure

Examples

1. Time range
Validity period: 02.Jan.1996 - 04.Jan.1996
Time: 10:00 - 17:00 o'clock
The employee is on call every day of the period, from 10:00 - 17.00 o'clock.

2. On call duty
Validity period: 05.Jan.1995 - 08.Jan.1995
Time: 17:00 - 08:00 o'clock
The employee is on call over the weekend from Friday, 17:00 to Monday, 08:00 o'clock.

Dependencies

Supplementary Documentation - PEBEGUZ 0003

Use

In combination with the End Time field, the Start Time field specifies a time period in which a clock-in entry should lie in order to be selected during dynamic daily work schedule assignment for the daily work schedule specified.

Supplementary Documentation - PEBEGUZ 0004

Use

Start time of a partial day absence.

Procedure

Examples

Dependencies

History
Last changed by/on SAP  20050224 
SAP Release Created in