Data Element PDSRNDPR
Short Description Bucket Offset for Product Availability in Production  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DEC1_2    
Data Type DEC   Counter or amount field with comma and sign 
Length 3    
Decimal Places 2    
Output Length 4    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 BucketOff. 
Medium 15 Bucket Offset 
Long 20 Bucket Offset 
Heading 54 Bucket Offset for Product Availability in Production 
Documentation

Definition


Factor used by the SNP optimizer to calculate the availability date of a receipt element within a period (bucket).

Use

If a product is available in the middle of a bucket, the system must know if the product can be used at the start of this bucket or at the end of this bucket (which is the same as at the start of the next bucket). For this purpose, the system uses two rounding limits, one for transported products and one for produced products.

These rounding limits are used in the following way: First, the system evaluates the relevant calendars to determine the exact availability date of the products. Then, the length of the bucket based on this date is multiplied by the percentage specified in this field, to calculate the rounding limit within this bucket. If the exact availability date lies before or at the rounding limit, the product is available at the start of the bucket; if not, the product is available at the start of the next bucket.

Rule of thumb:

  • Greater values represent an optimistic view because they imply that the products tend to be available earlier than specified.
  • Smaller values represent a more conservative view because they imply that the products are guaranteed to be available.

Dependencies

If you enter a value for the bucket offset in the PDS maintenance, then this value overwrites the value entered in the SNP optimizer profile.

The SNP heuristic does not consider the bucket offset.

Example

History