SAP ABAP Data Element PCMAM_NOPARA (Kanban Quantity Due to Replenishment Lead Time)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       MD05 (Package) Development class KANBAN
Basic Data
Data Element PCMAM_NOPARA
Short Description Kanban Quantity Due to Replenishment Lead Time  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type MENG13    
Data Type QUAN   Quantity field, points to a unit field with format UNIT 
Length 13    
Decimal Places 3    
Output Length 17    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Qty RLT 
Medium 15 Qty Due to RLT 
Long 40 Kanban Qty Due to Replen. Lead Time 
Heading 40 Kanban Qty Due to Replen. Lead Time 
Documentation

Definition

Shows the quantity per kanban needed to cover material requirements due to the replenishment lead time.

Use

The system calculates this value on the basis of the replenishment lead time (without safety factor and without buffer).

Dependencies

You can specify the replenishment lead time as follows:

  • In the material master
  • In the control cycle, in the Replenishment Lead Time (Days) or Replenishment Lead Time (Hours:Minutes) field on the Kanban Calculation tab page.
  • In the control cycle on the Kanban Calculation tab page, by specifying the details of the replenishment lead time (refill time, wait time, transportation time)

Example

History
Last changed by/on SAP  20100310 
SAP Release Created in 605