SAP ABAP Data Element PBR_DIASAD (Maximum number of absence days to allow advances)
Hierarchy
☛
SAP_HRCBR (Software Component) Sub component SAP_HRCBR of SAP_HR
⤷
PA-PA-BR (Application Component) Brazil
⤷
PB37 (Package) HR master data: Brazil
⤷
⤷
Basic Data
| Data Element | PBR_DIASAD |
| Short Description | Maximum number of absence days to allow advances |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | NUMC2 | |
| Data Type | NUMC | Character string with only digits |
| Length | 2 | |
| Decimal Places | 0 | |
| Output Length | 2 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | No.of days |
| Medium | 15 | Number of days |
| Long | 40 | Number of days for advances |
| Heading | 4 | Days |
Documentation
Definition
When preparing advance payments calculation, that value indicates the maximum number of absence days the employee should have to be entitled to advance payment.
History
| Last changed by/on | SAP | 19990223 |
| SAP Release Created in |