SAP ABAP Data Element OIC_CRDOFF (Offset from reference date for currency)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ OIC (Package) MAP Marketing, Accounting and Pricing
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ OIC (Package) MAP Marketing, Accounting and Pricing
Basic Data
Data Element | OIC_CRDOFF |
Short Description | Offset from reference date for currency |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | OIC_OFFSET | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | CurR/DtOff |
Medium | 15 | Ref.date offset |
Long | 20 | Curr ref date offset |
Heading | 10 | Cu R/D Off |
Documentation
Definition
This field is used as one of two possible ways to determine the currency average period. It offsets the reference date to a related date. A period of time measured in different units can then be applied to the offset reference date both before and after. The offset reference date can also be excluded from the average period under certain conditions.
The other way of determining the average period is to fix the start and end dates using the 'fix date from' and 'fix date to' fields.
All fields which relate to the currency average period can only be entered if an average currency rule is entered.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in |