Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ COCR (Package) R/3 Application Development: PP-PI-POR, Process Orders
Basic Data
Data Element | NUM |
Short Description | Sequence number |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUM02 | |
Data Type | NUMC | Character string with only digits |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Seq. no. |
Medium | 15 | Sequence number |
Long | 20 | Sequence number |
Heading | 5 | SeqNo |
Documentation
Definition
Number for a selection variant for deviation recording
Use
If you want to define different tolerances for several operations (for example, for operations with different resources), you create several variants with the corresponding selection criteria.
Note
Make sure that a lower sequence number is assigned to the variant that contains the more restrictive selection criteria that the one with the less restrictive criteria as the variants are processed in the sequence specified by their sequence numbers.
Example
You want to specify a deviation tolerance of 5% for resource A whereas a tolerance of 10% is to be valid for all other resources. To do so, create a variant for resource A with 5% and another variant for all other resources with 10%. Assign, for example, sequence number "010" to the variant with 5% and the sequence number "020" for the variant with 10%.
Supplementary Documentation - NUMC_3 0001
Use
Implementation project number.
The customizing projects are for structuring implementations or release changes. By selecting the functions required for a customizing project, you reduce the implementation guide to the necessary activities.
Procedure
Enter the number of the project with which you want to work.
Examples
Dependencies
The restriction in the F1/F4 help using the project number leads you into the customizing project, in which you can make the settings for this application transaction.
You can then document the changes made in the customizing project and use the status management.
Supplementary Documentation - NUMKR 0001
Procedure
The number for the internal number assignment is recorded here.
Supplementary Documentation - NUMKR 0002
Procedure
The number for external number assignment is recorded here.
Supplementary Documentation - NUMTP 0001
Use
Procedure
You do not need to enter the EAN category if you assign the International Article Number (EAN) externally. In this case, the system determines the correct EAN category automatically.
If you want the system to assign the EAN (internal assignment), you enter an EAN category, but leave the EAN field blank.
If both the EAN field and the EAN category field contain values, the system assumes that you want to enter the EAN externally and that you have possibly entered an incorrect EAN category.
You can find out which EAN categories are suitable for internal number assignment by pressing F4.
Examples
Dependencies
History
Last changed by/on | SAP | 19970827 |
SAP Release Created in |