SAP ABAP Data Element NLFZT (Lead-Time Offset)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-MD-PRO (Application Component) Products
⤷ CS (Package) R/3 Application development: PP Bills of Material
⤷ CRM-MD-PRO (Application Component) Products
⤷ CS (Package) R/3 Application development: PP Bills of Material
Basic Data
Data Element | NLFZT |
Short Description | Lead-Time Offset |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NLFZT | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 4 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | LEAD_TIME_OFFSET_OPR | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | LT Offset |
Medium | 15 | Lead-Tm Offset |
Long | 20 | Lead-Time Offset |
Heading | 7 | LTOffst |
Documentation
Definition
This value shows the lead-time offset (in workdays) for the component in relation to the start date for production of the superior assembly.
This value is not included in lead-time scheduling for a task list.
Use
You can enter:
- A positive number of days
The component is not required until after the start date.
- A negative number of days
The component is required before the start date.
Examples
Assembly AS-11 (start date 05/13/1998):
Component Lead-time offset Finish date
M-01 2+ 05/15/1998
M-02 2- 05/11/1998
M-03 0 05/13/1998
- Component M-01 is not required until 2 days after the start date for the superior assembly.
- Component M-02 is required 2 days before the start date for the superior assembly, so the finish date for this component is 05/11/1998.
- The lead-time offset for component M-03 is 0, so the start date for the superior assembly is the same as the finish date for this component.
Note:
This information does not tell you the start date for the components, because the data required (such as in-house production time, processing time, or interoperation time) is not shown.
History
Last changed by/on | SAP | 19991102 |
SAP Release Created in |