Hierarchy
⤷ CRM-MD-PRO (Application Component) Products
⤷ CS (Package) R/3 Application development: PP Bills of Material
Basic Data
Data Element | NETAU |
Short Description | Indicator: Net Scrap |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | NET_SCRAP | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Net ID |
Medium | 15 | Net Indicator |
Long | 20 | Net Indicator |
Heading | 7 | Net ID |
Documentation
Definition
This indicator determines whether scrap for the component is calculated on the basis of the net required quantity (the required quantity without assembly scrap from the material master record).
Procedure
- You must set this indicator if you want assembly scrap to be ignored.
- You must set this indicator if you enter operation scrap.
- You can set this indicator if you only enter component scrap, to calculate scrap on the basis of the net required quantity for the assembly.
Examples
Bill of material:
- Assembly MAT-1:
- Required quantity 100 pieces
- Assembly scrap 2%
- Component MAT-2:
- Component quantity 100 pieces
Depending on the applicable scrap and the net indicator, the following 6 quantities are required for component MAT-2 for a required quantity of 100 pieces of MAT-1:
1 2 3 4 5 6
Comp 5% - 5% 5% - -
Op. 6% 6% - - - -
Net ind X X X - - X
---------------------------------------------------------------------
Qty 11130 10600 10500 10710 10200 10000
Key
Comp Component scrap
Op. Operation scrap
Net ind Net indicator
Qty Quantity calculated for component MAT-2 in pieces
Supplementary Documentation - NETAUTOCLS0001
Use
Procedure
Examples
Dependencies
If the frames are disregarded, the layout is calculated only on the basis of the nodes. The frames are subsequently placed around the nodes. This can result in overlapping frames.
History
Last changed by/on | SAP | 19991102 |
SAP Release Created in |