SAP ABAP Data Element NETAU (Indicator: Net Scrap)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-MD-PRO (Application Component) Products
     CS (Package) R/3 Application development: PP Bills of Material
Basic Data
Data Element NETAU
Short Description Indicator: Net Scrap  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name NET_SCRAP   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Net ID 
Medium 15 Net Indicator 
Long 20 Net Indicator 
Heading Net ID 
Documentation

Definition

This indicator determines whether scrap for the component is calculated on the basis of the net required quantity (the required quantity without assembly scrap from the material master record).

Procedure

  • You must set this indicator if you want assembly scrap to be ignored.
  • You must set this indicator if you enter operation scrap.
  • You can set this indicator if you only enter component scrap, to calculate scrap on the basis of the net required quantity for the assembly.

Examples

Bill of material:

  • Assembly MAT-1:
    • Required quantity 100 pieces
    • Assembly scrap 2%
  • Component MAT-2:
    • Component quantity 100 pieces

Depending on the applicable scrap and the net indicator, the following 6 quantities are required for component MAT-2 for a required quantity of 100 pieces of MAT-1:

    1    2    3    4    5    6   

Comp    5%    -    5%    5%    -    -
Op.    6%    6%    -    -    -    -
Net ind    X    X    X    -    -     X
---------------------------------------------------------------------

Qty    11130    10600    10500    10710    10200    10000

Key

Comp    Component scrap
Op.    Operation scrap
Net ind    Net indicator
Qty    Quantity calculated for component MAT-2 in pieces

Supplementary Documentation - NETAUTOCLS0001

Use

Procedure

Examples

Dependencies

If the frames are disregarded, the layout is calculated only on the basis of the nodes. The frames are subsequently placed around the nodes. This can result in overlapping frames.

History
Last changed by/on SAP  19991102 
SAP Release Created in