SAP ABAP Data Element MLST_ACTDT (Actual date (Milestone met))
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PS-ST-OPR-NET (Application Component) Network and Activity
⤷ CN_NET_OPR (Package) Operative Network
⤷ PS-ST-OPR-NET (Application Component) Network and Activity
⤷ CN_NET_OPR (Package) Operative Network
Basic Data
Data Element | MLST_ACTDT |
Short Description | Actual date (Milestone met) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ACTUAL_DATE | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Actual |
Medium | 15 | Actual date |
Long | 20 | Actual date |
Heading | 10 | Actl. date |
Documentation
Definition
Date on which the percentage of completion was reached for the milestone.
The actual date is used to determine the actual percentage of completion when you use the milestone technique in earned value analysis.
Supplementary Documentation - MLST_ACTDT2850
Use
The actual date is calculated together with the percentage of completion for the activity. The actual date can be either:
- entered manually or
- copied from the activity confirmation, if the percentage of completion is less than or equal to the degree of completion in the confirmation.
Dependencies
You must have entered a percentage of completion in the milestone to be able to copy the date from the confirmation.
History
Last changed by/on | SAP | 19981109 |
SAP Release Created in |