SAP ABAP Data Element MBDAT_DRS (Material Availability Date Third-Party Order Planning)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       VL (Package) WS-SHP: General Processing for Shipping
Basic Data
Data Element MBDAT_DRS
Short Description Material Availability Date Third-Party Order Planning  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATUM    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name MS_DATE   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 MADate TPP 
Medium 15 Mat.Av.Date TPP 
Long 20 Mat.Avail.Date TPP 
Heading 14 MatAvDate TPP 
Documentation

Definition

Date on which a sufficient quantity of an item must be available so that picking can begin at the third-party vendor's site.

Use

The system uses the material availability date from third-party order planning (TPP) to determine the requirement forecasts for purchasing.

The system determines the material availability date for third-party order planning in the Business Add-In BAdI: Integration of External Third-Party Order Planning (BADI_SLS_ITEM_DIRECT_SHIPMENT1).

Procedure

The date is proposed in the Business Add-In BADI_SLS_ITEM_DIRECT_SHIPMENT1.
You cannot directly change this date in the sales document.

Dependencies

History
Last changed by/on SAP  20100310 
SAP Release Created in 605