SAP ABAP Data Element MBDAT_DRS (Material Availability Date Third-Party Order Planning)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
VL (Package) WS-SHP: General Processing for Shipping
⤷
⤷
⤷
Basic Data
| Data Element | MBDAT_DRS |
| Short Description | Material Availability Date Third-Party Order Planning |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | DATUM | |
| Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
| Length | 8 | |
| Decimal Places | 0 | |
| Output Length | 10 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | MS_DATE | |
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | MADate TPP |
| Medium | 15 | Mat.Av.Date TPP |
| Long | 20 | Mat.Avail.Date TPP |
| Heading | 14 | MatAvDate TPP |
Documentation
Definition
Date on which a sufficient quantity of an item must be available so that picking can begin at the third-party vendor's site.
Use
The system uses the material availability date from third-party order planning (TPP) to determine the requirement forecasts for purchasing.
The system determines the material availability date for third-party order planning in the Business Add-In BAdI: Integration of External Third-Party Order Planning (BADI_SLS_ITEM_DIRECT_SHIPMENT1).
Procedure
The date is proposed in the Business Add-In BADI_SLS_ITEM_DIRECT_SHIPMENT1.
You cannot directly change this date in the sales document.
Dependencies
History
| Last changed by/on | SAP | 20100310 |
| SAP Release Created in | 605 |