SAP ABAP Data Element LVS_RADIO_ANALYSIS (Radio button for controlling data evaluation)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       LVS (Package) Application development Warehouse Management (WM)
Basic Data
Data Element LVS_RADIO_ANALYSIS
Short Description Radio button for controlling data evaluation  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short  
Medium  
Long  
Heading  
Documentation

Definition



This group of radio buttons controls the type of data evaluation.

The following two options are available:

  1. Evaluation via transfer order (TO) header data
  2. Evaluation via TO item data

For the evaluation via TO header data, the system assigns complete transfer orders to one of the possible blocks. You should only select this method when TO splitting based on the picking area is switched on to generate TOs to be picked.

Reason:

The logical key for assignment to a block is the source storage type and the picking area. Both of these fields are in the TO item data, which means that they could be different in separate items of a single transfer order. If this is the case, the TO cannot be assigned to a "normal" block. Instead the system assigns it to to a special block "other".

If this is the case, you should definitely select the evaluation via TO item data.

For the evaluation via TO item data, the system assigns the TO items individually to one of the possible blocks. In this case, splitting based on the picking area is not involved.

Special aspects about the planned TO processing time:

  • For the evaluation via TO header data, the planned TO processing times are added together via the two fields in the TO header (planned workload in the WM system plus the planned workload in the external system).
  • For the evaluation via TO item data, the planned TO processing time is calculated by adding together the planned processing times in the TO items.

History
Last changed by/on SAP  19980514 
SAP Release Created in