Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ LVS (Package) Application development Warehouse Management (WM)
Basic Data
Data Element | LVS_KISTZ |
Short Description | Indicator: Actual time required in TO |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | LVS_KISTZ | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Act.timeTO |
Medium | 19 | Act.time req.in TO |
Long | 27 | Actual time required in TO |
Heading | 27 | Act.time required in TO |
Documentation
Definition
Displays whether the entry of actual time for a WM transfer order is necessary and in which format it is supposed to appear (by entering actual duration time or by entering start and end times). You can enter start and end times manually in a dialog box or the system can post them automatically.
Use
This indicator controls which dialog box appears. Depending upon the indicator you use, the system selects the fields that are to be displayed for data entry. It also triggers the posting of the local system time in the corresponding data element of the WM transfer order.
Dependencies
To enable the entry of actual times, the field Indicator: Performance data must configured with the proper characteristic. Possible characteristics include:
2: Entry of actual data
3: Calculation of planned times and entry of actual times
4: Determination of incentive wages
Notes relevant to incentive wages and actual time:
To utilize the calculation of incentive wages in the HR component based on WM transfer orders, the entry of actual times is not absolutely necessary. As a minimum, the system needs the worker (personnel) number and the calculation of the planned (target) time per transfer order. If the actual times are entered as well, the system passes this data to HR which then influences the calculation of the incentive wages.
History
Last changed by/on | SAP | 19970812 |
SAP Release Created in |