SAP ABAP Data Element LVS_GWSOZ (Limiting value based on planned TO processing time)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ LVS (Package) Application development Warehouse Management (WM)
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ LVS (Package) Application development Warehouse Management (WM)
Basic Data
Data Element | LVS_GWSOZ |
Short Description | Limiting value based on planned TO processing time |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | LVS_ZEITD | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 13 | |
Decimal Places | 3 | |
Output Length | 17 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | PlTimLimit |
Medium | 15 | P.time limit |
Long | 20 | Plan time limit |
Heading | 18 | PlTimLimit |
Documentation
Definition
Planned TO processing time as criterion for controlling transfer order splitting.
Use
To prevent the total planned processing time for a transfer order from exceeding a certain duration of time, you can enter a value in this field. From the total available items, this limiting value determines how many transfer orders will be created.
History
Last changed by/on | SAP | 19970902 |
SAP Release Created in |