SAP ABAP Data Element LTAK_SOLWM (Planned Transfer Order Processing Time From WM)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       LVS (Package) Application development Warehouse Management (WM)
Basic Data
Data Element LTAK_SOLWM
Short Description Planned Transfer Order Processing Time From WM  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type PW_QUAN13    
Data Type QUAN   Quantity field, points to a unit field with format UNIT 
Length 13    
Decimal Places 3    
Output Length 18    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Plan Time 
Medium 15 Plan Time WM 
Long 20 Plan Time WM 
Heading 14 Plan Time WM 
Documentation

Definition

The planned processing time in the transfer order (TO) header is the processing time for the entire TO as calculated by the WM system. The planned TO processing time references the time unit (for example, minutes or seconds) that is calculated for the warehouse number. It is calculated as the sum of the planned processing times for the transfer order items, the setup time and the travel time.
PLAN(wm) = PLAN(ITEM) + PLAN(SETUP) + PLAN(TRAVEL)

Note:

The total planned processing time includes the planned processing time in WM plus the planned processing time that was transmitted from an external system to WM:
TIME(TOTAL) = TIME(WM) + TIME(EXTERNAL)

History
Last changed by/on SAP  19970812 
SAP Release Created in