Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CP (Package) R/3 Application development: PP Task Lists
Basic Data
Data Element | LOHN |
Short Description | Indicator: Print time tickets |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | FLAG | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | TmeTickets |
Medium | 15 | Print time tic. |
Long | 20 | Print time tickets |
Heading | 5 | TmeT |
Documentation
Definition
This indicator specifies that time tickets are printed for the following objects if specified in the control key you selected:
- operations and sub-operations in Quality Management (QM), Plant Maintenance (PM) and Production Planning (PP)
- activities and activity elements in the Project System (PS)
- operations and phases in Production Planning for Process Industries (PP-PI)
The system ignores this indicator if set for secondary resources.
Dependencies
This setting is only taken into account if, in Customizing for print control (section List control for transaction),
- printing of time tickets is permitted for corresponding order type, plant and MRP controller (QM, PS, PP and PP-PI) or for order type, planning plant and planner group (PM)
- control key check when time tickets are printed is active
To print the time tickets, you must also
- set the Print indicator in the control key
- set a number greater than "0" of time tickets to be printed in the order (see General Data for the respective operation, sub-operation or phase).
Note
For PP and PP-PI, you can specify in the production scheduling profile that shop floor papers are automatically printed when the order is released.
Supplementary Documentation - LOHNANZ 4420
Definition
Number of time tickets that should be printed for order processing for the operation, the phase or the secondary resource.
Dependencies
This entry is only taken into account, if printing of the time tickets has been set up in Customizing the print control, using the <GL:Control key>control key
The number of time tickets is suggested by the system using defaults in the primary or secondary resources. You can change the default in the recipe, as long as the resource is not marked as a reference.
Supplementary Documentation - LOHNART 1218
Definition
Wage type key to be used for settling the incentive wages, to calculate the employee's wages for an operation segment.
Use
The system transfers the wage type as a default value from the routing to the production order and from there to the confirmation.
The wage type of an operation or a work center is transfered under the following conditions to the Incentive Wages (PA-INW) application component:
- If you edit a time ticket for incentive wages with reference to a production order, the default wage type is transfered from the relevant operation or work center
- If you generate or edit a time ticket for incentive wages with reference to a confirmation, the confirmed wage type is transfered. The prerequisite for this is that a personnel number has been entered in the confirmation. This is only possible for time ticket confirmations and not for the confirmations of time events.
Dependencies
The system suggests a wage type for the routing according to the defaults from the work center. You can change the default value in the routing as long as it has not been declared to be a reference in the work center.
Supplementary Documentation - LOHNART 4420
Definition
Key that specifies the wage type to be used in incentive wage accounting to calculate the wage or salary of an employee for a work step.
Use
The system uses the wage type defined in the recipe and transfers it as a default value into the process order and then into order confirmation.
The wage type of a phase or secondary resource is transferred to the HR module under the following conditions:
- If you enter a time ticket with reference to a process order for incentive wages, the default wage type is transferred from the corresponding phase or secondary resource.
- If you enter or generate a time ticket with reference to a confirmation for incentive wages, the confirmed wage type is transferred, provided that a personnel number has been maintained in the confirmation. This is only possible for time ticket-related confirmations but not for confirmations of time events.
Wage types for operations are maintained for information purposes only. The system does not compare the wage type of an operation with that of its subordinate phases.
Procedure
Examples
Dependencies
The system proposes the wage type in the recipe according to the definitions made in the primary or secondary resource. You can change the default values in the recipe, provided that they have not been marked as references in the resource master record.
Supplementary Documentation - LOHNGRP 1218
Definition
A key that classifies the work to be done in one work step in terms of work evaluation (unskilled tasks, skilled tasks, for example).
Use
The system takes the wage group as a default value from the routin in the production order, and transfers it to the completion confirmation. In the standard system, the wage and salary accounting are unaffected by this.
Note:
You can use an SAP enhancement on the interface between Production Planning and Incentive Wages (see IMG on Incentive Wages, section Integration with Logistics). This enhancement enables you to adjust your interface so that the wage group is transferred as a pay scale group to time tickets that are created or generated in incentive wages with reference to an order or a completion confirmation.
However, please note that
- Wage groups and wage scale groups are maintained in different tables
- the wage group has three characters, the pay scale group has eight
- the wage group is maintained with reference to the plant, the pay scale group with reference to the pay scale area, pay scale type, etc.
You must ensure that your data is consistant.
Procedure
Examples
Dependencies
The system proposes the wage group in the routing as default as specified in the work center. You can change the default value in the routing as long as it is not marked as a reference in the work center.
Supplementary Documentation - LOHNGRP 4420
Definition
A key that classifies the work to be done in one work step in terms of work evaluation (unskilled tasks, skilled tasks, for example).
Use
The system takes the wage group as a default value from the recipe in the process order, and transfers it to the completion confirmation. In the standard system, the wage and salary accounting are unaffected by this.
Note:
You can use an SAP enhancement on the interface between Production Planning and Incentive Wages (see IMG on Incentive Wages, section Integration with Logistics). This enhancement enables you to adjust your interface so that the wage group is transferred as a pay scale group to time tickets that are created or generated in incentive wages with reference to an order or a completion confirmation.
However, please note that
- Wage groups and wage scale groups are maintained in different tables
- the wage group has three characters, the pay scale group has eight
- the wage group is maintained with reference to the plant, the pay scale group with reference to the pay scale area, pay scale type, etc.
You must ensure that your data is consistant.
Procedure
Examples
Dependencies
The system proposes the wage group in the recipe as default as specifiedin the primary and secondary resources. You can change the default value in the recipe as long as it is not marked as a reference in the resource master record.
History
Last changed by/on | SAP | 20130604 |
SAP Release Created in |