SAP ABAP Data Element LKO74NBL (Debit balance from settlement in CO area currency)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
KABR (Package) Appl. development: R/3 Cost Accounting order settlement
⤷
⤷
⤷
Basic Data
| Data Element | LKO74NBL |
| Short Description | Debit balance from settlement in CO area currency |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | WERTV8 | |
| Data Type | CURR | Currency field, stored as DEC |
| Length | 15 | |
| Decimal Places | 2 | |
| Output Length | 21 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | SttlmntDr |
| Medium | 15 | Settlement Dr |
| Long | 20 | Settlement debit |
| Heading | 0 |
Documentation
Definition
The amount representing a second or subsequent charge to an object already settled. Settlement to the object is thus incomplete.
A settlement is incomplete if an object which has already been settled receives another charge from a different sender in the same settlement run.
Examples
During an object group settlement, object 2 was settled. In the same settlement run, however, object 5 is settled to object 2. This represents a new charge for object 2, which thus has an open charge from settlement.
History
| Last changed by/on | SAP | 19980428 |
| SAP Release Created in |