SAP ABAP Data Element LGINT (Iterpretation of MRP dates: long-term planning)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
MD (Package) Application development R/3 requirements planning
⤷
⤷
⤷
Basic Data
| Data Element | LGINT |
| Short Description | Iterpretation of MRP dates: long-term planning |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | INTKA | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Interpret. |
| Medium | 15 | Inter.of dates |
| Long | 20 | Interpret. of dates |
| Heading | 4 | Int. |
Documentation
Definition
This indicator is used for the long-term planning to determine how the start date of the planning calendar period for grouping requirements using the lot size with planning calendar periods should be interpreted.
- If you set the indicator "1", the start date of the planning calendar periods is interpreted as the delivery date
- If the indicator is not set, the start or finish date of the planning calendar periods is interpreted as the availability date independent of the scheduling indicator.
Note
A time difference exists between the delivery date and the availability date due to the goods receipt processing time.
History
| Last changed by/on | SAP | 19950401 |
| SAP Release Created in |