SAP ABAP Data Element LDPS_CHK_AEGR (Complete group)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ PP (Application Component) Production Planning and Control
⤷ LALD (Package) Logistics Automotive Line Design
⤷ PP (Application Component) Production Planning and Control
⤷ LALD (Package) Logistics Automotive Line Design
Basic Data
Data Element | LDPS_CHK_AEGR |
Short Description | Complete group |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | RBUTTON | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Compl.grp |
Medium | 20 | Complete group |
Long | 40 | Complete group |
Heading | 40 | Complete group |
Documentation
Definition
When an operation is changed, the remaining operations of the group are printed.
Use
This field is only taken into consideration if you have marked the field 'Only operation changes since' and entered a date behind it. If, in this case, you select the option 'Complete group', all operations of a routing, work center or a takt are printed, dependent on the Grouping, as soon as at least one operation in this routing, work center or takt has been changed sinced the date entered.
Dependencies
The option Grouping also controls whether the system prints a cover sheet per routing, line segment or takt, if you have entered a template in the field Cover sheet template.
History
Last changed by/on | SAP | 19990520 |
SAP Release Created in |