SAP ABAP Data Element LD_TIME_USED (Time occupied in line balancing)
Hierarchy
BBPCRM (Software Component) BBPCRM
   PP (Application Component) Production Planning and Control
     LALD (Package) Logistics Automotive Line Design
Basic Data
Data Element LD_TIME_USED
Short Description Time occupied in line balancing  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type LD_TIME_USED    
Data Type QUAN   Quantity field, points to a unit field with format UNIT 
Length 11    
Decimal Places 3    
Output Length 14    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short Time Occ. 
Medium 10 Time occ. 
Long 15 Time occupied 
Heading 10 Time occ. 
Documentation

Definition

Gives the Work content of a line segment or a takt. The system totals the operation times of the assigned operations.

Use

Using the times displayed you can make a detailed evaluation of the quality of the line balance. You can, for example, test the load percentage for:

  • Each segment for which you have entered the number of takts and the number of individual capacities.
  • Each takt of these line segments, if you have selected the indicator Line balancing-relevant for the takts of the line segments.

In the case of an overload or underload in a line segment or takt, you can move operations in the line balancing graphic if applicable, and change the number of takts and individual capacities.

Dependencies

  • Make sure that all operations of the rate routing are assigned to a takt or a line segment before you evaluate the execution times.
  • The Takt balancing at the bottom of the tab page Execution times is a measure of the quality of the line balance over the total production line.