SAP ABAP Data Element LD_TERMARBPL (Planning segment in the line hierarchy)
Hierarchy
BBPCRM (Software Component) BBPCRM
   PP (Application Component) Production Planning and Control
     LALD (Package) Logistics Automotive Line Design
Basic Data
Data Element LD_TERMARBPL
Short Description Planning segment in the line hierarchy  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type ARBPL    
Data Type CHAR   Character String 
Length 8    
Decimal Places 0    
Output Length 8    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Plng seg. 
Medium 15 Planning segmnt 
Long 20 Planning segment 
Heading 11 Plng segmnt 
Documentation

Definition

Gives the Line segment of a production line, which the system refers to for the entire production line for planning in the planning table.

  • Lead time scheduling
  • The system carries out a midpoint scheduling around this planning segment. As a rule the planning segment is the production line's bottle neck work center.
  • Sequencing
  • The planning segment serves as the basis for sequencing. The production start and finish dates in the planning table always relate to the first or the last takt of the planning segment.

Use

  • You determine the planning segment of a production line in the Line hierarchy. The system automatically transfers the planning segment into the production version.
  • If you have not defined a planning segment in the line hierarchy, the system uses the line hierarchy header.

History
Last changed by/on SAP  19980505 
SAP Release Created in