SAP ABAP Data Element LD_MRATE (Rate for material)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ PP (Application Component) Production Planning and Control
⤷ LALD (Package) Logistics Automotive Line Design
⤷ PP (Application Component) Production Planning and Control
⤷ LALD (Package) Logistics Automotive Line Design
Basic Data
Data Element | LD_MRATE |
Short Description | Rate for material |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MENG13 | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 13 | |
Decimal Places | 3 | |
Output Length | 17 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Rate |
Medium | 15 | Rate |
Long | 20 | Rate |
Heading | 17 | Rate |
Documentation
Definition
Gives the quantity of the material that you want to produce within the validity period of the line balancing version.
Use
The total of the production rates per material is the planned production rate for the line balance.
Dependencies
You can determine planned independent requirements and planned orders that already exist for the material, and adopt them as required.
To do this, select Receipts/reqmts.
A dialog box appears, showing the average and maximum receipts and requirements for a period of selection. You can change the period of selection as required.
History
Last changed by/on | SAP | 19980414 |
SAP Release Created in |