SAP ABAP Data Element LAGE (Location of reference value)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷ IS-U-MD (Application Component) Master Data
⤷ EE01 (Package) IS-U Master Data
⤷ IS-U-MD (Application Component) Master Data
⤷ EE01 (Package) IS-U Master Data
Basic Data
Data Element | LAGE |
Short Description | Location of reference value |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | LAGE | |
Data Type | CHAR | Character String |
Length | 4 | |
Decimal Places | 0 | |
Output Length | 4 | |
Value Table | TE133 |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Location |
Medium | 15 | Location |
Long | 20 | Location |
Heading | 4 | Loc. |
Documentation
Definition
Specifies the location of the reference value.
Supplementary Documentation - LAGE_FR 0001
Definition
Stipulates where the requirements date of a component should lie in the schedule planning of an activity.
Set the indicator for
- Components with a positive requirements quantity if the requirements date is the latest schedule date of the activity. If you do not set the indicator, the requirements date is the earliest scheduled date of the activity.
- Components with a negative requirements quantity if the requirements date is the latest finish date of the activity. you do not set the indicator, the requirements date is the earliest finish date of the activity.
A negative requirements quantity is entered for a material that is produced.
Dependencies
For more information about settings for start or finish dates, see the IMG activity Maintain Network Profiles in the F1 help for Align.Fin.date.
Example
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in |