Hierarchy
⤷ LO (Application Component) Logistics - General
⤷ DIMP_STD (Package) Standard Objects of DIMP Industries
Basic Data
Data Element | LABREV |
Short Description | Forecast Delivery Schedule: Change of Revision Level |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Rev. Level |
Medium | 15 | Revision Level |
Long | 23 | Revision Level Change |
Heading | 23 | Revision Level Change |
Documentation
Definition
Determines whether or not a forecast delivery schedule for the message output is stopped in the event of a change in the revision level of the relevant material within the release horizon.
Use
If you select this indicator, forecast delivery schedules are generated by the release creation program, but held back from the message output process.
Note
The stopping of SA releases is only possible in the case of scheduling agreements with release documentation if a separate message is generated for each SA release (Rel.Mess. indicator in Customizing for Message Control ) and if SA releases are generated using the release creation program (transaction ME84/program RM06EFLB).
SA releases generated manually during delivery schedule maintenance are not stopped.
Dependencies
Stopped SA releases must be released in a separate step (Purchasing -> Outline Agreement -> Scheduling Agreement -> Delivery Schedule -> Release Stopped SA Releases).
A message record is not generated until you release (approve, clear for issue) a stopped SA release.
Note
If releases have been created and stopped with the release creation report, the MRP controller responsible can be informed about this with the Workflow.
More information is available in the SAP Library under SAP Automotive -> MM Scheduling Agreements Enhancements -> SA Releases: Process -> Workflows for the MRP Controllers.
Example
History
Last changed by/on | SAP | 20041209 |
SAP Release Created in | 46C |