SAP ABAP Data Element KZAPF (Indicator: released for work scheduling)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM-MD-PRO (Application Component) Products
⤷
CS (Package) R/3 Application development: PP Bills of Material
⤷
⤷
Basic Data
| Data Element | KZAPF |
| Short Description | Indicator: released for work scheduling |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFELD | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Rel wk sch |
| Medium | 15 | Rel wk sched. |
| Long | 20 | Rel wk scheduling |
| Heading | 9 | RelWkSch. |
Documentation
Definition
This indicator controls the release of a BOM for work scheduling.
This enables you to allocate material components in a BOM to an operation in a routing.
Use
Used as a criterion for:
- defining the BOM status
- defining the procedure for automatic alternative determination
Dependencies
In the different areas in a company (such as scheduling), the BOM is exploded according to application. When you define the application for a specific area in the company, you must select this status indicator in the Minimum BOM status requirements dataset before the BOM can be read for BOM explosion.
History
| Last changed by/on | SAP | 19930713 |
| SAP Release Created in |