SAP ABAP Data Element KST_KST_I (Cost Element for Valuated Actual Costs)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ KKAG (Package) Period costing individual case
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ KKAG (Package) Period costing individual case
Basic Data
Data Element | KST_KST_I |
Short Description | Cost Element for Valuated Actual Costs |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | KKG_KSTAR | |
Data Type | CHAR | Character String |
Length | 10 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | CElemC(av) |
Medium | 15 | Cost elem.C(av) |
Long | 20 | CostElemVltdActCosts |
Heading | 10 | CElemC(av) |
Documentation
Definition
Specifies the cost element under which the system writes the valuated actual costs. The valuated actual costs are the costs that are written under category K.
Both WIP calculation and results analysis are based on the costs of category K.
Use
Procedure
Examples
Example of WIP calculation:
Suppose USD 1,000 is charged to a production order in period 01. No goods receipt takes place. You calculate the WIP. USD 1,000 is updated as valuated actual costs. Then an additional USD 300 is charged to the production order. No goods receipt takes place.
The order now carries USD 1,300 in actual costs.
The valuated actual costs are USD 1,000. That is, the work in process is USD 1,000.
To take the additional USD 300 into account, you calculate the WIP again.
Dependencies
History
Last changed by/on | SAP | 19931130 |
SAP Release Created in |