SAP ABAP Data Element KST_KST_I (Cost Element for Valuated Actual Costs)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-CIC (Application Component) Interaction Center WinClient
     KKAG (Package) Period costing individual case
Basic Data
Data Element KST_KST_I
Short Description Cost Element for Valuated Actual Costs  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type KKG_KSTAR    
Data Type CHAR   Character String 
Length 10    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 CElemC(av) 
Medium 15 Cost elem.C(av) 
Long 20 CostElemVltdActCosts 
Heading 10 CElemC(av) 
Documentation

Definition

Specifies the cost element under which the system writes the valuated actual costs. The valuated actual costs are the costs that are written under category K.

Both WIP calculation and results analysis are based on the costs of category K.

Use

Procedure

Examples

Example of WIP calculation:

Suppose USD 1,000 is charged to a production order in period 01. No goods receipt takes place. You calculate the WIP. USD 1,000 is updated as valuated actual costs. Then an additional USD 300 is charged to the production order. No goods receipt takes place.

The order now carries USD 1,300 in actual costs.

The valuated actual costs are USD 1,000. That is, the work in process is USD 1,000.

To take the additional USD 300 into account, you calculate the WIP again.

Dependencies

History
Last changed by/on SAP  19931130 
SAP Release Created in