SAP ABAP Data Element KST_BST_BI (Cost Element for Capitalized Costs + WIP (Creation/Balance))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ KKAG (Package) Period costing individual case
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ KKAG (Package) Period costing individual case
Basic Data
Data Element | KST_BST_BI |
Short Description | Cost Element for Capitalized Costs + WIP (Creation/Balance) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | KKG_KSTAR | |
Data Type | CHAR | Character String |
Length | 10 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | CElem C(p) |
Medium | 15 | Cost elem. C(p) |
Long | 20 | CostElemCapCosts(Cr) |
Heading | 10 | CElem C(p) |
Documentation
Definition
Depending on the settings in the results analysis version, this specifies the following:
- The cost element under which the capitalized costs or the work in process that has been created for this line ID is written, or
- The cost element under which the balance of creation and usage of a capitalized cost or work in process is written
Use
In results analysis, the capitalized costs can be shown under this cost element.
In WIP calculation, the work in process can be shown under this cost element.
The capitalized costs or the work in process is shown under this cost element in the Cost Object Controlling Information System.
Dependencies
- If you have turned on the Split creation/usage indicator in the results analysis version, this cost element shows the inventory for this line ID that was created by results analysisor WIP calculation.
- If you have not turned on the Split creation/usage indicator in the results analysis version, this cost element shows the balance - that is, the difference between creation and usage.
When you settle, a posting for the work in process is generated in Financial Accounting and Profit Center Accounting if you have done the following:
- Turned on the Transfer to Financial Accounting indicator in the results analysis version
- Defined a posting rule for the work in process
History
Last changed by/on | SAP | 19980218 |
SAP Release Created in |