Data Element | KONTKOST_G |
Short Description | Total Control Costs |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WERTV8 | |
Data Type | CURR | Currency field, stored as DEC |
Length | 15 | |
Decimal Places | 2 | |
Output Length | 21 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Total ctrl |
Medium | 15 | Total ctrl cost |
Long | 20 | Total control costs |
Heading | 40 | Total control costs |
Documentation
Definition
Total value of the control costs.
This value is the sum of the control cost debits and control cost credits.
Use
In variance calculation, the control costs are compared with the target costs to calculate the variances.
Prerequisites
Before you calculate the variances, calculate the work in process.
Dependencies
The system calculates the control costs automatically when it calculates the variances.
The control costs are calculated in different ways depending on the variances to be calculated.
For the total variances and production variances, the control costs are actual costs less the work in process and scrap. For the planning variances, the control costs are calculated on the basis of the preliminary cost estimate for the order. For the total variances and the production variances, the reference quantity is the actual quantity deliverd to stock. For the planning variances, the reference quantity is the planned order quantity.
Deducting the work in process and scrap from the actual costs ensures that only true variance are calculated.
History
Last changed by/on | SAP | 19980617 |
SAP Release Created in |