Hierarchy
⤷ CO-PC-IS (Application Component) Product Cost Controlling Information System
⤷ KKB (Package) Reporting for Costing
Basic Data
Data Element | KKBSOIS_KOST_A |
Short Description | Absolute Target/Actual Cost Variance |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WERTV8 | |
Data Type | CURR | Currency field, stored as DEC |
Length | 15 | |
Decimal Places | 2 | |
Output Length | 21 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Variance |
Medium | 15 | Tgt/actual var. |
Long | 20 | Target/actual var. |
Heading | 21 | Target/actual var. |
Documentation
Definition
Difference between the target costs and actual costs.
Use
Target costs are the planned costs adjusted to the actual operating rate.
The target debit of a manufacturing order is the sum of the activity-independent planned debit of the order and the activity-dependent planned debit of the order multiplied by the actual quantity of the order.
The target credit of a manufacturing order results from the goods receipts to stock. The delivered actual quantity is valuated with the planned price according to the price control.
In variance calculation, the target costs are calculated and written to the database. The target costs are compared with the control costs to calculate the variances.
Dependencies
The calculation of target costs depends on the selected target cost version.
History
Last changed by/on | SAP | 19980617 |
SAP Release Created in |