Hierarchy
⤷ CO-PC-IS (Application Component) Product Cost Controlling Information System
⤷ KKB (Package) Reporting for Costing
Basic Data
Data Element | KKB_SOLLKOST_G |
Short Description | Total Target Costs |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WERTV8 | |
Data Type | CURR | Currency field, stored as DEC |
Length | 15 | |
Decimal Places | 2 | |
Output Length | 21 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Total tgt |
Medium | 15 | Total tgt costs |
Long | 20 | Total target costs |
Heading | 15 | Total tgt costs |
Documentation
Definition
Total value of the target costs.
Calculated with the following formula:
Total target costs = Target cost debit + Target cost credit.
Use
Target costs are the planned costs adjusted to the actual operating rate.
The target debit on a manufacturing order is the sum of the activity-independent planned debit of the order and the activity-dependent planned debit of the order multiplied by the actual quantity of the order.
The target credit of a manufacturing order results from the goods receipt postings to stock. The delivered actual quantity is valuated with the planned price according to the price control.
The total value of the target costs is the sum of the target debit and the target credit.
The target costs are calculated during variance calculation and updated to the database.
The target costs cannot be shown until you have performed variance calculation for this target cost version. The target credit for the calculation of the total variances and production variances cannot be calculated until an actual quantity for an order exists after a goods receipt posting.
For the calculation of variances, the target costs are compared with the control costs.
Dependencies
The calculation of target costs depends on the selected target cost version.
History
Last changed by/on | SAP | 20000201 |
SAP Release Created in |