SAP ABAP Data Element KKB_SOLLKOST_G (Total Target Costs)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-PC-IS (Application Component) Product Cost Controlling Information System
     KKB (Package) Reporting for Costing
Basic Data
Data Element KKB_SOLLKOST_G
Short Description Total Target Costs  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WERTV8    
Data Type CURR   Currency field, stored as DEC 
Length 15    
Decimal Places 2    
Output Length 21    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Total tgt 
Medium 15 Total tgt costs 
Long 20 Total target costs 
Heading 15 Total tgt costs 
Documentation

Definition

Total value of the target costs.

Calculated with the following formula:

Total target costs = Target cost debit + Target cost credit.

Use

Target costs are the planned costs adjusted to the actual operating rate.

The target debit on a manufacturing order is the sum of the activity-independent planned debit of the order and the activity-dependent planned debit of the order multiplied by the actual quantity of the order.

The target credit of a manufacturing order results from the goods receipt postings to stock. The delivered actual quantity is valuated with the planned price according to the price control.

The total value of the target costs is the sum of the target debit and the target credit.

The target costs are calculated during variance calculation and updated to the database.

The target costs cannot be shown until you have performed variance calculation for this target cost version. The target credit for the calculation of the total variances and production variances cannot be calculated until an actual quantity for an order exists after a goods receipt posting.

For the calculation of variances, the target costs are compared with the control costs.

Dependencies

The calculation of target costs depends on the selected target cost version.

History
Last changed by/on SAP  20000201 
SAP Release Created in