Hierarchy
⤷ CO-PC-IS (Application Component) Product Cost Controlling Information System
⤷ KKB (Package) Reporting for Costing
Basic Data
Data Element | KKB_SOLLENTL_GO |
Short Description | Target Cost Credit in Object Currency |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WERTV8 | |
Data Type | CURR | Currency field, stored as DEC |
Length | 15 | |
Decimal Places | 2 | |
Output Length | 21 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Tgt credit |
Medium | 16 | Tgt cost credit |
Long | 20 | Tgt cost credit OC |
Heading | 15 | Tgt cost credit |
Documentation
Definition
Total amount of the target cost credit, shown in object currency or company code currency.
Use
Target costs are obtained from the planned costs that are adjusted to the actual operating rate. The target costs on a manufacturing order can, for example, be obtained from the sum of the activity-independent planned costs of the order and the activity-dependent planned costs multiplied by the confirmed quantity of the order.
Target costs are calculated during variance calculation and written to the database. For the calculation of variances, the target costs are compared with the control costs.
The calculation of the target cost credit only includes the credit side of the cost object. The target credit of a cost object is calculated from the goods receipts for delivery to stock by multiplying the actual delivered quantity by the planned costs.
Dependencies
The calculation of target costs depends on the target cost version.
History
Last changed by/on | SAP | 19980514 |
SAP Release Created in |