SAP ABAP Data Element KKB_SOLLBEL_GK (Target Cost Debit in Controlling Area Currency)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-IS (Application Component) Product Cost Controlling Information System
⤷ KKB (Package) Reporting for Costing
⤷ CO-PC-IS (Application Component) Product Cost Controlling Information System
⤷ KKB (Package) Reporting for Costing
Basic Data
Data Element | KKB_SOLLBEL_GK |
Short Description | Target Cost Debit in Controlling Area Currency |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WERTV8 | |
Data Type | CURR | Currency field, stored as DEC |
Length | 15 | |
Decimal Places | 2 | |
Output Length | 21 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Tgt debit |
Medium | 15 | Tgt cost debit |
Long | 20 | Tgt cost debit CAC |
Heading | 15 | Target debit |
Documentation
Definition
Total amount of the target cost debit, shown in controlling area currency.
Use
Target costs are obtained from the planned costs that are adjusted to the actual operating rate. The target costs on a manufacturing order can, for example, be obtained from the sum of the activity-independent planned costs of the order and the activity-dependent planned costs multiplied by the confirmed quantity of the order.
Target costs are calculated during variance calculation and written to the database. For the calculation of variances, the target costs are compared with the control costs.
The calculation of the target cost debit only includes the debit side of the cost object.
Dependencies
The calculation of target costs depends on the target cost version.
History
Last changed by/on | SAP | 19980514 |
SAP Release Created in |