Hierarchy
⤷ CO-PC-IS (Application Component) Product Cost Controlling Information System
⤷ KKB (Package) Reporting for Costing
Basic Data
Data Element | KKB_CAL2_CALC1 |
Short Description | Variance Between Cost Estimate and Material Master Price |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WERT11V | |
Data Type | CURR | Currency field, stored as DEC |
Length | 11 | |
Decimal Places | 2 | |
Output Length | 15 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Costing/MM |
Medium | 16 | Var. costing/MM |
Long | 20 | Variance costing/MM |
Heading | 0 |
Documentation
Definition
The key figure Costing/MM shows the difference between the value of the cost estimate and the material master price entered in the selection screen of the report.
You can enter any price from the material master in the selection screen of the report. This price is then made available in the report display as a selectable field and can be used for example to compare that price with the standard price. Variances between the selectable price and the cost estimate value calculated in the costing run can be shown in the report using the key figure Costing/MM.
Formulas
Costing/MM = Cost estimate value - Material master price
Or as a percentage:
(Cost estimate - Material master price) / Material master price * 100
Remarks:
The cost estimate value uses the cost component view of the selection screen.
The material master price is entered in the selection screen.
History
Last changed by/on | SAP | 19990503 |
SAP Release Created in |