SAP ABAP Data Element KKA_P_FIBU (Transfer Planned Results Analysis to Financial Accounting?)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-CIC (Application Component) Interaction Center WinClient
     KKAG (Package) Period costing individual case
Basic Data
Data Element KKA_P_FIBU
Short Description Transfer Planned Results Analysis to Financial Accounting?  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type ABGRFIBUKZ    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 PlanRAtoFI 
Medium 15 PlanRAtoFI 
Long 27 Planned RA to Financials 
Heading 10 PlanRAtoFI 
Documentation

Definition

If this indicator is turned on, you can transfer to Financial Accounting the results analysis data that was saved under this results analysis version. If Profit Center Accounting is active, an additional posting in Profit Center Accounting is generated on the basis of this posting.

Use

Procedure

To be able to transfer results analysis data to Financial Accounting, you must do the following:

  • Define a settlement rule for the order or the WBS element
  • Define posting rules in Customizing that assign the work in process with a requirement to capitalize and the reserves to the relevant G/L accounts in Financial Accounting.

Examples

Dependencies

In results analysis it is possible to carry out a cross-company valuation for projects or sales orders and save the result under a results analysis version. You must not transfer the results of this valuation to Financial Accounting.

History
Last changed by/on SAP  19970827 
SAP Release Created in