SAP ABAP Data Element KKA_KST_PLB_KOS (Cost Element for Planned Costs of Valuation)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-CIC (Application Component) Interaction Center WinClient
     KKAG (Package) Period costing individual case
Basic Data
Data Element KKA_KST_PLB_KOS
Short Description Cost Element for Planned Costs of Valuation  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type KKG_KSTAR    
Data Type CHAR   Character String 
Length 10    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 CostEl PCV 
Medium 15 CostEl PCostVal 
Long 20 CostEl PlanCostVal 
Heading 10 CostEl PCV 
Documentation

Definition

Specifies the cost element with which the planned costs of valuation used in results analysis is updated.

Use

This cost element is only required for internal purposes. It can be used for customer-specific evaluations.

If you don't want to perform evaluations on the basis of this cost element, then you don't need to create a separate cost element. In this case you only need to create a technical results analysis cost element.

Procedure

If you don't want to create a separate cost element, choose Cost Elements Off. Then create a technical results analysis cost element.

Otherwise, enter a separate cost element. Use a cost element of cost element category 31.

Dependencies

For detailed information on results analysis, see the documentation Product Cost by Sales Order under Period-End Closing -> Results Analysis.

History
Last changed by/on SAP  20020124 
SAP Release Created in