SAP ABAP Data Element KIGDAYS (Number of Days Without Requirements to Be Ignored)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       MD05 (Package) Development class KANBAN
Basic Data
Data Element KIGDAYS
Short Description Number of Days Without Requirements to Be Ignored  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DEC3    
Data Type DEC   Counter or amount field with comma and sign 
Length 3    
Decimal Places 0    
Output Length 3    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Days Ign. 
Medium 15 Days Ignored 
Long 33 No. Days w/o Reqmts to Be Ignored 
Heading 44 No. Days Without Requirements to Be Ignored 
Documentation

Definition

Indicates the number of consecutive days without requirements that the system is not to take into account in the kanban calculation.

Use

  • If you specify the number of days for which there are no requirements here, the system adopts the requirement proposal of the previous day for the days without requirements.

  • If you do not enter a value or one that is smaller than the actual number of days without requirements, the system performs the kanban calculation on the basis of the actual requirements. That is to say, on days with 0 requirements, the system calculates a proposal with 0 kanban containers or a kanban quantity of 0.

Dependencies

If you have stipulated a value in the transaction Create Change Proposal(PK07), this value is adopted in the dialog box of the kanban graphic in the transaction Check Result of Kanban Calculation (PK08N).

Example

The following requirements exist in a week with 5 workdays:

Day    Requirement   

Monday    12 pc

Tuesday    10 pc

Wednesday    0

Thursday    0

Friday    11 pc

If you enter the value 2 in the Ignore Days Without Requirements field, the system adopts the proposal calculated for Tuesday for Wednesday and Thursday.

History
Last changed by/on SAP  20100310 
SAP Release Created in 605