SAP ABAP Data Element KALC_PRODPER (Allocation: Derive Production Month)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       KALC (Package) Cost Accounting allocations RK-S
Basic Data
Data Element KALC_PRODPER
Short Description Allocation: Derive Production Month  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CHAR1    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Prod.Month 
Medium 18 Production Month 
Long 25 Derive Production Month 
Heading 25 Derive Production Month 
Documentation

Definition

You use Production Month (date) to report costs in the production month rather than in the posting period. If you activate Production Month functionality, the production month can be entered in the production date field. If no date is entered, the document date is used as the production date by default.

The production date can be entered in FI documents only. CO always takes the document date (except in the allocation process). MM transactions take the document field, except in the MM invoice process (MIRO), where it takes the highest production date of all goods receipts.

You can set the status of the production date field in the field status maintenance; it is located in JVA Partner.

All subsequent JVA processes (for example, Cutback, Suspense, Overhead) are processed before the original production date.

Use

Production Month is available in assessment and distribution cycles.

Derive Production Month in the cycle header definition enables the production month of the receiver to be derived.

If the indicator is set, the production month is available as selection criteria for the senders and the production month from the sender is passed on to the receiver. If the indicator is not set, the information on the production month is cleared in the resulting cycle posting for sender and receiver.

After the allocation process, you can to perform follow-on actions like billing using the receivers' production month.

Dependencies

Example

History
Last changed by/on SAP  20110901 
SAP Release Created in 606