SAP ABAP Data Element KALAW (CO-PA: Costing key)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       KE (Package) Profitability Analysis
Basic Data
Data Element KALAW
Short Description CO-PA: Costing key  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type KALAW    
Data Type CHAR   Character String 
Length 3    
Decimal Places 0    
Output Length 3    
Value Table TKEVA03    
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID KALAW  
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Cstg key 
Medium 15 Costing key 
Long 20 Costing key 
Heading 10 Cstg key 
Documentation

Definition

The costing key determines which product cost estimate is used to valuate value fields in Profitability Analysis (CO-PA).

  • By maintaining the access parameters Costing variant, Version, and Additive cost estimate you can specify a particular cost estimate that should be used to valuate the document in CO-PA.
    When you do so, you also need to enter a Costing date or Period/year, or select the Period indicator.
    You may not select the "Transfer sales order cost estimate" indicator.
  • If you select the Transfer sales order cost estimate indicator, you tell the system to read the sales order cost estimate for each specific sales order item.

    In this case, the fields "Costing variant", "Version", "Additive cost estimate", "Costing date", "Period/year", and "Period indicator" must be left blank, because the cost estimate to be read is already determined by the sales order item.
  • The control parameters Auxiliary cost component split and Transfer in controlling area currency let you specify whether the auxiliary cost component split should be transferred, or whether the cost estimate should be transferred in the controlling area currency.
  • You use the Plant used for reading cost estimate to determine which plant should be used to read a valid cost estimate for a given material. For the standard setting, it is not necessary to determine the plant at costing key level. This is because it is usually sufficient to read the material cost estimates using the plant found in the CO-PA line item.
  • By setting the control parameter "exclusive access to costing", the system performs, instead of a parallel valuation using various costing keys, an alternative valuation using a single costing key at a time.
  • By setting the control parameter "error message if no cost estimate available", an error message will always appear whenever no cost estimate is found for the costing key being dealt with.

History
Last changed by/on SAP  20130529 
SAP Release Created in