SAP ABAP Data Element JBDSOFKALK (Costing Date Immediate Procedure)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       JBA (Package) Application developmnet IS-B General Development
Basic Data
Data Element JBDSOFKALK
Short Description Costing Date Immediate Procedure  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATS    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Cost.Date 
Medium 17 Cost.Date Immed. 
Long 33 Costing Date Immediate Procedure 
Heading 33 Costing Date Immediate Procedure 
Documentation

Definition

This field shows when the costing calculation of the immediate procedures (margin NPV, effective interest rate, opportunity interest rate) was executed. It contains the corresponding costing date.

The system uses this field to control which results are included in the profitability analysis. Only the values of those cash flows which were calculated in the respective period are transferred.

History
Last changed by/on SAP  20110901 
SAP Release Created in