SAP ABAP Data Element J_3GZUTVHLG (Ind.: Acquisition Date Counts (as Daily Settlement for PBE))
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷ IS-EC-CEM (Application Component) Construction Equipment Management
⤷ J3GD (Package) CEM Dictionary Objects
⤷ IS-EC-CEM (Application Component) Construction Equipment Management
⤷ J3GD (Package) CEM Dictionary Objects
Basic Data
Data Element | J_3GZUTVHLG |
Short Description | Ind.: Acquisition Date Counts (as Daily Settlement for PBE) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | X | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | WthAcqDate |
Medium | 15 | With acq. date |
Long | 20 | With acq. date |
Heading | 3 | AD |
Documentation
Definition
Controls whether, in special cases (see example), the acquisition date is charged to the recipient in days (as time-based equipment).
Special Case - Example
If PBE repoorts have been created on the retirement date for the sending construction site, but none have been created for the receiving construction site, then the acquisition date would also be settled in days. This means that the equipment item would be charged for twice on the same date (double settlement).
Activities
Do not set this indicator if you want to avoid double settlement.
Dependencies
Acquisition date PBE
History
Last changed by/on | SAP | 20050301 |
SAP Release Created in |