SAP ABAP Data Element J_3GZUTVHLG (Ind.: Acquisition Date Counts (as Daily Settlement for PBE))
Hierarchy
ECC-DIMP (Software Component) DIMP
   IS-EC-CEM (Application Component) Construction Equipment Management
     J3GD (Package) CEM Dictionary Objects
Basic Data
Data Element J_3GZUTVHLG
Short Description Ind.: Acquisition Date Counts (as Daily Settlement for PBE)  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type X    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 WthAcqDate 
Medium 15 With acq. date 
Long 20 With acq. date 
Heading AD 
Documentation

Definition

Controls whether, in special cases (see example), the acquisition date is charged to the recipient in days (as time-based equipment).

Special Case - Example

If PBE repoorts have been created on the retirement date for the sending construction site, but none have been created for the receiving construction site, then the acquisition date would also be settled in days. This means that the equipment item would be charged for twice on the same date (double settlement).

Activities

Do not set this indicator if you want to avoid double settlement.

Dependencies

Acquisition date PBE

History
Last changed by/on SAP  20050301 
SAP Release Created in