Hierarchy
⤷
⤷
Basic Data
| Data Element | J_3GVMONAT |
| Short Description | Indicator for Complete Month |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | J_3GVMONAT | |
| Data Type | NUMC | Character string with only digits |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Compl. mth |
| Medium | 15 | Complete month |
| Long | 20 | Complete month |
| Heading | 12 | Complete mth |
Documentation
Definition
Serves as indicator for determining the number of days to be settled.
Dependencies
If the settlement type is 1 or 2, then you must make an entry for the complete month indicator.
In addition, you must enter the average number of calendar or working days for days/month.
Examples
Normal case or,for example, to fulfill the requirements set out in the construction equipment specifications catalog (BGL 1991) - (commissioning month = 30 calendar days = 170 commissioning hours), the following must be set:
Settlement type = 1 (full month + remaining calendar days) and
Complete month indicator = 2 (complete month is encompassed)
Days/month = 30 (for February also)
Examples
Special case for work cooperatives/joint ventures:
If an equipment item is in operation on a construction site from 10.01 - 10.31, then 31 days have to be settled. 30 days have to be settled from 11.01. - 11.30.
Settlement type = calendar days
History
| Last changed by/on | SAP | 20050301 |
| SAP Release Created in |