SAP ABAP Data Element J_3GMASCHB ("Fill PBE Documents" Indicator)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷
IS-EC-CEM (Application Component) Construction Equipment Management
⤷
J3GD (Package) CEM Dictionary Objects
⤷
⤷
Basic Data
| Data Element | J_3GMASCHB |
| Short Description | "Fill PBE Documents" Indicator |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | J_3GMASCHB | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | PBE doc. |
| Medium | 15 | PBE document |
| Long | 26 | Fill PBE document |
| Heading | 10 | PBE doc. |
Documentation
Definition
Determines whether operators' reports should be created or completed/filled for this recipient. Filling gaps in the operator's report takes place independently of the settlement calendar functions.
Example
Space = neither create (1) nor complete (2)
1 = missing daily reports are created
2 = existing daily reports are completed/filled
3 = create (1) and complete (2)
Notes
This indicator only takes effect in combination with the stock (inventory) check per equipment for PBE.
Dependencies
Acquisition date PBE
Retirement date PBE
Acquisition date counts
History
| Last changed by/on | SAP | 20050301 |
| SAP Release Created in |