SAP ABAP Data Element J_3GLG_VAR (Display Variant for PBE Report)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷ IS-EC-CEM (Application Component) Construction Equipment Management
⤷ J3GD (Package) CEM Dictionary Objects
⤷ IS-EC-CEM (Application Component) Construction Equipment Management
⤷ J3GD (Package) CEM Dictionary Objects
Basic Data
Data Element | J_3GLG_VAR |
Short Description | Display Variant for PBE Report |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | J_3GLG_VAR | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | PBE dsply |
Medium | 15 | PBE dsply var. |
Long | 20 | PBE display variant |
Heading | 10 | PBE dsply |
Documentation
Definition
Controls the display varaint for the perfomance-based equipment report.
Possible display variants:
- Daily report (multiple item entry)
- Weekly report
- Daily report (single item entry)
Notes
You can only enter activities performed for one particular day in the daily report (multiple item entry).
In the weekly report, the days that have been entered from - to in the time period are displayed for entry purposes.
The daily report (single item entry) is a variant of the daily report (multiple item entry). Although you can only enter one item (equipment), you can enter other additional information, for example, counter reading - start, counter reading - end etc. for this day.
History
Last changed by/on | SAP | 20050301 |
SAP Release Created in |