SAP ABAP Data Element J_3GKLEIVO (Indicator: Calculate PBE as TBE)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷ IS-EC-CEM (Application Component) Construction Equipment Management
⤷ J3GD (Package) CEM Dictionary Objects
⤷ IS-EC-CEM (Application Component) Construction Equipment Management
⤷ J3GD (Package) CEM Dictionary Objects
Basic Data
Data Element | J_3GKLEIVO |
Short Description | Indicator: Calculate PBE as TBE |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | X | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | PBE as TBE |
Medium | 15 | PBE as TBE |
Long | 20 | Calculate PBE as TBE |
Heading | 12 | PBE as TBE |
Documentation
Definition
Controls whether performance-based equipment can be settled in the same way as time-based equipment for this recipient.
Example
Space = PBE is settled as PBE
X = PBE is settled as if it were TBE
Notes
This indicator only has an effect in combination with the indicator Stock Check per equipment for PBE.
History
Last changed by/on | SAP | 20050301 |
SAP Release Created in |