SAP ABAP Data Element J_3GFMGUE (Release Notification Allowance for Unrestricted Usage (Days))
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷ IS-EC-CEM (Application Component) Construction Equipment Management
⤷ J3GD (Package) CEM Dictionary Objects
⤷ IS-EC-CEM (Application Component) Construction Equipment Management
⤷ J3GD (Package) CEM Dictionary Objects
Basic Data
Data Element | J_3GFMGUE |
Short Description | Release Notification Allowance for Unrestricted Usage (Days) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUMC | |
Data Type | NUMC | Character string with only digits |
Length | 5 | |
Decimal Places | 0 | |
Output Length | 5 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 6 | RNAUR |
Medium | 15 | RelNotAllUnrUsg |
Long | 20 | RelNotifAllowUnrUsge |
Heading | 5 | RNAUR |
Documentation
Definition
For unrestricted usage of time-based equipment, you can define a number of days as of which a release notification has to be written before the equipment item is sent.
Example
10 days. Equipment item is sent to construction site with activity type E (in operation) on 07.10. A release notification must be written as of 07.21.
Notes
If this time allowance of 10 days is exceeded and the equipment item is sent, for example, on 07.22 without a release notification, then a surcharge for unrestricted usage is charged in settlement in accordance with the deadline logic (in the form of additional SD order item). Corresponds to deadline indicator 2 for Usage Period Deadlines per Transaction Type and Activity Type.