Hierarchy
⤷ IS-EC-CEM (Application Component) Construction Equipment Management
⤷ J3GD (Package) CEM Dictionary Objects
Basic Data
Data Element | J_3GBARTM |
Short Description | Inventory Management Type/Material |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | J_3GBARTM | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | InvMgtTM |
Medium | 15 | InvMgmtTypeMat. |
Long | 20 | Inv. mgmt type mat. |
Heading | 8 | InvMgtTM |
Documentation
Definition
Here you define whether you want inventory management to take place for materials or not during document creation.
Examples
Space = No inventory management
1 = Chronological, without missing parts/shortfall quantities
2 = Not chronological (chaotic), with missing parts/shortfall qty
Notes
You cannot enter shipping documents in retrospect in chronological inventory management. Only the amount of stock that was originally sent to the construction site can be sent away from it. Negative stock is not allowed.
Chaotic inventory management allows negative stock. This means that you can send more stock from a construction site than has actually been sent to it.
Dependencies
For materials, inventory management can take place on two levels:
1) Determine Inventory Management Type per Document Category
2 Inventory Management in ETM per Material Type
History
Last changed by/on | SAP | 20050301 |
SAP Release Created in |