SAP ABAP Data Element J_3GBARTE (Inventory Management Type/Equipment)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷ IS-EC-CEM (Application Component) Construction Equipment Management
⤷ J3GD (Package) CEM Dictionary Objects
⤷ IS-EC-CEM (Application Component) Construction Equipment Management
⤷ J3GD (Package) CEM Dictionary Objects
Basic Data
Data Element | J_3GBARTE |
Short Description | Inventory Management Type/Equipment |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | J_3GARTBES | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | InvMgtTE |
Medium | 15 | InvMgmtTypeEqui |
Long | 20 | Inv. Mgmt Type Equi. |
Heading | 8 | InvMgtTE |
Documentation
Definition
Field to define whether inventory management takes place for equipment shipping documents.
Possible values:
Space = No inventory management
1 = Chronological, without misssing parts/shortfall quantity
2 = Not chronological (chaotic), with missing parts/shortfall qty
Notes
You cannot enter shipping documents in retrospect for chronological inventory management. You can only send as much stock from the construction site as was originally sent to the construction site. Negative stock is not allowed.
Chaotic inventory management means that you send more stock away from the construction site than was actually sent to it in the first place. (Negative stock).
Dependencies
Inventory management for equipment can take place on 3 levels:
History
Last changed by/on | SAP | 20050301 |
SAP Release Created in |