SAP ABAP Data Element ISH_VERFU (Availability of Material)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
NPAS (Package) Application development patient accounting system

⤷

⤷

⤷

Basic Data
Data Element | ISH_VERFU |
Short Description | Availability of Material |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | ICON | |
Data Type | CHAR | Character String |
Length | 4 | |
Decimal Places | 0 | |
Output Length | 4 | |
Value Table | ICON |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 5 | Avail |
Medium | 9 | Available |
Long | 9 | Available |
Heading | 4 | Avai |
Documentation
Definition
The symbol is displayed either as a traffic light or as a warning sign. If a traffic light appears, this indicates the result of the availability check for the reserved material:
- Green traffic light: Reservation can be picked in full
- Yellow traffic light: Reservation can only be picked in part, since not enough material is available in the storage facility.
- Red traffic light: Reservation cannot be picked, since this material is currently not available in the storage facility.
- Scales: During the picking run, more of the material than available in the storage facility was requested. The picking agent him-/herself can ensure a just allocation of stock.
If a warning sign is displayed instead of a traffic light, this indicates that the corresponding row is an alterative pick option. Such a row is generated if
- A requested material is available in several storage locations
- Several available batches of a material exist.
Caution:
Several alternative pick proposals can exist for a reservation. If you pick a material from two storage locations, for example, ensure that the total quantity requested is not exceeded.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in |