SAP ABAP Data Element ISH_STMOAB (IS-H: Start Month of Evaluation Period)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ NBAS (Package) Appl. development Hospital System master data, catalogs
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ NBAS (Package) Appl. development Hospital System master data, catalogs
Basic Data
Data Element | ISH_STMOAB |
Short Description | IS-H: Start Month of Evaluation Period |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | ISH_MONAT | |
Data Type | NUMC | Character string with only digits |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Start mnth |
Medium | 14 | Start month |
Long | 20 | Start month |
Heading | 8 | StrtMnth |
Documentation
Definition
Here, you can specify which month the evaluation period begins. The default setting for the start day is the first day of the month.
Use
Make sure that the beginning of the evaluation period (start month and start year) comes before the end of the evaluation period (end month and end year).
If you do not specify a start month, the system sets it to the same month as the end month. If you do not specify either month, the system sets the start month to January.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in |